Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Tower Engineering Corporation is considering undertaking several proposed projec

ID: 3604487 • Letter: T

Question

Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel following table Project 20 55 47 38 90 63 15 45 50 40 70 70 1.0 1.8 2.0 1.5 3.6 2.2 Engineers Required Support Personnel Required DO -Profit ($1,000,000s) Formulate a binary program that maximizes Tower's profit subject to the following management constraints: Note. Variables of interest are P1. P2, P3. P, P, and P eti ESTia MAX ARy VALUES i12

Explanation / Answer

def fib(limit):

     

    # Initialize first two Fibonacci Numbers

    a, b = 0, 1

    # One by one yield next Fibonacci Number

    while a < limit:

        yield a

        a, b = b, a + b

# Create a generator object

x = fib(5)

# Iterating over the generator object using next

print(x.next()); # In Python 3, __next__()

print(x.next());

print(x.next());

print(x.next());

print(x.next());

# Iterating over the generator object using for

# in loop.

print(" Using for in loop")

for i in fib(5):

    print(i)

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote