D A Which following production process term best describes the situation when ac

ID: 355651 • Letter: D

Question

D A Which following production process term best describes the situation when activities in a stage of production must stop because there is no work? a. Blocking b. Buffering c. Starving d. Buffer e. Setup time 28. 30. A process flowchart uses symb which of the following? a. Factory location b. Warehouse space available c. Work force schedules d. Flows of material or customers e. Data analysis According to Little's law, which of the following can be used to estimate work-in-process inventory? a. Process time/Cycle time b. Throughput rate times throughput time c. Process velocity/Throughput time d. Set up time/Throughput rate e. Value added time/Process velocity 31. 29. Which of the following best describes the term cycle time? Average time between completions of successive units Ratio of the time a resource is activated over its use a. b. Can be no more than 60 minutes c. d. The same as utilization The labor content of the item being measured e. Company C refurbishes rundown business students. The process uses a moving belt, which carries each student through the five steps of the process in sequence. The five steps are as follows: 32. Step Description Time required per student I minutes 2 minutes 1.2 minutes 1.5 minutes 1.2 minutes 2Strip off bad habits Scrub and clean mind Insert modern methods S Polish and pack One faculty member is assigned to each of these steps. Faculty members work a 48-hour week and rotate jobs each week. What is the maximum output of the production line? a 1600 b. 2000 e. 1550 d. 1440 None of the above e. A process flowchart uses which of the following symbols to represent storage areas or queues in a flow

Explanation / Answer

1 C Starving

Starving is the situation. In general terms it refers to when someone does not have food to eat. In organizational term it is used when there is no work.


2 A. Average time between completions of successive units

Cycle time is time taken from starting to end process activities. So this is the correct option.

3 D. Flows of material or customers

A process flow chart uses symbols to represent Flows of material or customers.

4 D. Inventory/Throughput rate

As per Little’s law the formula is Inventory/Throughput rate

Experts are opt for max 4 questions is one go. Pl ask the rest questions separately.