Question:1

The aim of value engineering is to

Question:2  

In time study, the rating factor is applied to determine

Question:3

Gantt chart is used for

Question4

The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)

Question:1

The aim of value engineering is to

A. find the depreciation value of a machine B. determine the selling price of a product C. minimise the cost without change in quality of the product D. all of the above

Question:2  

In time study, the rating factor is applied to determine

A. standard time of a job B. merit rating of the worker C. fixation of incentive rate D. normal time of a worker

Question:3

Gantt chart is used for

A. inventory control B. material handling C. production schedule D. machine repair schedules The aim of value engineering is to In time study, the rating factor is applied to determine Gantt chart is used for The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)

Explanation / Answer

Answer is C C D D