Scenario: You are a project manager for a company that manufacturers transportat
ID: 348834 • Letter: S
Question
Scenario: You are a project manager for a company that manufacturers transportation products that cornforms to unique customer specifications. The company’s production staffing is: 1 designer, 3 electrical technicians, and 4 mechanical fabricators. The company has the following core competencies: design, frame fabrication, metal fabrication, and electrical harness fabrication. A meeting with a proposed customer has brought a developed a list of requested items. (touring cycle configuration [similar to Honda Goldwing], halogen light package, Harley-Davidson 1800cc engine, custom seat [dual independent seats with customer specified leather embossing], customer approved wheel design, stereo with AM/FM/Weather/Bluetooth with front/rear speakers. side and rear luggage compartments, extra wide rear tire, dual headlights). The customer has indicated that the product is needed prior to the next Sturgis Motorcycle Rally.
Phase 01: Create a project scope with: inclusions/exclusions, customer provided items, and estimated delivery date. (deliverable: document)
Explanation / Answer
Project Scope Statement
Project Name: Sturgis Rally Motorcycle
Project Code: SRM
Project Manager: Peter Sanders
Scope Description
In Scope:
Out of Scope:
Project Deliverables
Sports Motorcycle with following specifications:
- Halogen light package.
- 1,800 cc engine of Harley Davidson.
- Dual independent seats (having customized leather embossing).
- Wheel design (as approved by customer).
- Stereo having AM/FM//Bluetooth and Weather along with Speakers (Front and Rear).
- Luggage Compartments (Side and Back).
- Back tires (extra broad).
- Headlights (dual).
Acceptance Criteria
Project will be accepted if all the required spare parts are available in the market and are of desired quality.
Constraints
Small size of production staffing team and tight delivery schedule.
Assumptions
The project will be completed on time without any cost overrun.
Delivery Date
04/01/2018
Prepared by: Joseph Williams
Date: 03/13/2018
Approved by: Terry Parker
Date: 03/14/2018
Project Scope Statement
Project Name: Sturgis Rally Motorcycle
Project Code: SRM
Project Manager: Peter Sanders
Scope Description
In Scope:
- Custom configured motorcycle to be used in rallies.
- Production staffing team consisting of Designer (1), Electrical Technician (3) and Mechanical Fabricator (4).
- Company Core Competencies with respect to Design, Frame Fabrication, Metal Fabrication and Electrical Harness Fabrication.
Out of Scope:
- Return of product after purchase.
- Any other type of fabrication.
- Free servicing beyond one year of purchase.
- On-site repair of vehicle.
Project Deliverables
Sports Motorcycle with following specifications:
- Halogen light package.
- 1,800 cc engine of Harley Davidson.
- Dual independent seats (having customized leather embossing).
- Wheel design (as approved by customer).
- Stereo having AM/FM//Bluetooth and Weather along with Speakers (Front and Rear).
- Luggage Compartments (Side and Back).
- Back tires (extra broad).
- Headlights (dual).
Acceptance Criteria
Project will be accepted if all the required spare parts are available in the market and are of desired quality.
Constraints
Small size of production staffing team and tight delivery schedule.
Assumptions
The project will be completed on time without any cost overrun.
Delivery Date
04/01/2018
Prepared by: Joseph Williams
Date: 03/13/2018
Approved by: Terry Parker
Date: 03/14/2018