5. Consider a production line of two stations in tandem. Each station has a sing
ID: 3430179 • Letter: 5
Question
5. Consider a production line of two stations in tandem. Each station has a single server and a dedicated buffer (of infinite size) for its waiting jobs. T he mean service times at station j is mi minutes, j = 1,2. Jobs arrive at station station 1 at rate ? jobs/minute. Each job is processed at station 1 first, at station 2 next, and then exits the system. When a server is bus the arriving job to the station waits in the buffer. When a server completes the processing of a jobs it picks the next job from the buffer to process. For each scenario below, find the utilization for each station and the system throughput, the rate at which jobs leave station 2. (a) lambda = 2, m1 = .4, m2 = .45. (b) lambda = 2, m1 = .6. m2 = .45. (c) lambda = 2, m1 = .4. m2 = .6. (d) lambda = 2, m1 = .6, m2 = .8.Explanation / Answer
A transfer line is a manufacturing system which consists of a predetermined sequence of machines connected by an automated material handling system and designed for working on a very small family of parts. Parts can be moved singularly because there
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.