Petro entered into an agreement with Darla Construction for Darla to install a wing of a hospital. The contract required all changes and additional work to be in writing. The electrician is installing the various electrical outlets. The architect asks that an added outlet be installed on a certain wall. If the contractor waits to get a written change order it will cost about $1,000 to get the electrician back and redo the work however, if the outlet is added now, it will cost about $10 for the added labor costs. Contractor says, “Sure but it will cost extra”. What should the contractor do?

Explanation / Answer

Petro entered into an agreement with Darla Construction for Darla to install a wing of a hospital. The contract required all changes and additional work to be in writing. The electrician is installing the various electrical outlets. The architect asks that an added outlet be installed on a certain wall. If the contractor waits to get a written change order it will cost about $1,000 to get the electrician back and redo the work however, if the outlet is added now, it will cost about $10 for the added labor costs. Contractor says, “Sure but it will cost extra”. What should the contractor do?

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote