I need help on this A bank wanted to measure if the time a customer spends at a
ID: 3353847 • Letter: I
Question
I need help on this
A bank wanted to measure if the time a customer spends at a drive-up window was within control. It took four samples of five observations each and recorded the time in minutes (see table). Use three sigma control limits to find if the process is under statistical control.
Note: Round your answer to one decimal point
Sample
Time1
Time2
Time3
Time4
Time5
1
4.5
4.2
4.2
4.3
4.3
2
4.6
4.5
4.4
4.7
4.3
3
4.5
4.6
4.4
4.4
4.6
4
4.7
4.6
4.8
4.5
4.9
True
False
0 points
QUESTION 2
The sample size n is
3
4
5
6
1 points
QUESTION 3
CL for the x-bar chart is
4
4.5
.7
.3
1 points
QUESTION 4
UCL for the x-bar chart is
4.7
4.0
4.3
.5
1 points
QUESTION 5
CL for the R chart is
2.1
4.3
1.2
.3
1 points
QUESTION 6
LCL for the R chart is
0
1.2
3.2
.3
1 points
QUESTION 7
I understand that the problem below is used to answer the next 5 MC questions. Please click True.
The Crystal Sparkle Co. produces glass tumblers. The plant is designed to produce 400 tumblers per hour, and there is one eight-hour shift per working day. The employees take two 15-minute breaks in each shift, one in the first four hours and one in the second four hours. The first thirty minutes of the shift are spent raising the kilns to the required temperature for firing glass. The plant usually produces about 2000 tumblers per day. Answer the following questions by adjusting the data to one eight-hour shift.
True
False
0 points
QUESTION 8
Design Capacity is
2000
2500
3000
3200
1 points
QUESTION 9
Effective Design Capacity is
3000
2700
2800
3200
1 points
QUESTION 10
The Efficiency is
60.5%
74.3%
71.4%
90%
1 points
QUESTION 11
The Utilization is
65.2%
73.8%
41.7%
62.5%
1 points
QUESTION 12
If management wants the plant to be 85% efficient, the actual output per day should be
2800
2380
2830
3200
Sample
Time1
Time2
Time3
Time4
Time5
1
4.5
4.2
4.2
4.3
4.3
2
4.6
4.5
4.4
4.7
4.3
3
4.5
4.6
4.4
4.4
4.6
4
4.7
4.6
4.8
4.5
4.9
Explanation / Answer
8)
Design capacity = 8 hrs. x 400 tumblers = 3,200 tumblers per 8-hour shift
9)
Effective capacity = Design capacity - Nonproductive activities
Design capacity 8.0 hrs.
Less: Breaks .5 hrs.
Heat-up .5 hrs.
Net productive time 7.0 hrs.
Effective capacity = 7 hrs. x 400 tumblers = 2,800 tumblers.
10
Actual output = 10,000/5 = 2,000 tumblers per 8-hour shift. (This is an average
output. In reality, there could be variation; some shifts could exceed 2,000
tumblers while others fall short.)
Efficiency = Actual output/Effective capacity = (100)(2000)/2800 = 71.43%
11
Utilization = Actual output/Design capacity = (100)(2000)/3200 = 62.50%
12)
0.85 * 2800 = 2380