ditch at least 2 /2 ft (750 mm) deep, at the installer s opr Which of the follow
ID: 3348943 • Letter: D
Question
ditch at least 2 /2 ft (750 mm) deep, at the installer s opr Which of the following statem electrode is correct? a. It is permitted to be connected to equipment 8. ents about the installation of an auxiliary grounding rather than an equipment groundin conductor when the manufacturer wants a "clean ground." b. It is permitted to be installed at parking lot lighting metal poles rather than connect- ing an equipment grounding conductor from the branch circuit. It is permitted to supplement but not replace the equipment grounding conductor with the branch circuit. d. The installer has the option of installing either the equipment grounding conductor or the local grounding electrode or both.Explanation / Answer
ANS - d)The installer has the option of installing either the equipment graunding conductor or the local grounding electrode or both.
the section that is most commonly associated with grounding, and that is the earthing side of grounding. Earthing is the intentional connection of electrical components to the earth/soil.Remember that in the United States, and several other parts of the world, we use the single word "grounding" to indicate both the above-grade copper/aluminum conductor system and the below-grade copper/steel earthing electrode system. In Europe and many other countries, these terms are separated from each other; the above-grade copper/aluminum conductor system
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.