Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

10-12 please with work shown struggle is real 10-12 please with work shown strug

ID: 3320419 • Letter: 1

Question

10-12 please with work shown struggle is real 10-12 please with work shown struggle is real 10. Calculate the Reliability of a system that has 5 parts and the system reliability is equal to 0.921 (15 points) a. 0.663 b. 0.921 c. 0.123 d. 0.158 11. Calculate the reliability of a system with a series arrangement of R1-0.989, R2-0.889, R3- 0900, R4-0.921 (15 points) a. 0.729 b. 0.989 0.889 d. 0.921 R1 R2 R3 R4 12. Calculate the reliability of a system with a series arrangement of R1-0.989, R2·0.889, R3 0.900, R4 -0.921 and a parallel system with R5 0.880 parallel to R6-0.985 (15 points) a. 0.729 b. 0.333 .0.989 d. 0.727 RS R1 R2 R3 R4 R6 13, which of the following would make the QA engineer require 100% testing for quality control? Circle one (15 points) a. b. c. Destructive testing is required Customer will accept non-conforming parts Vender has poor quality control record

Explanation / Answer

We are allowed to do only 1 question at a time. Please post again for other questions.

11) In other words, for a pure series system, the system reliability is equal to the product of the reliabilities of its constituent components.

So, here the system reliability will be the product of individual reliabilities.

R = 0.098 * 0.889 * 0.9 * 0.921

R = 0.729

A option

Hire Me For All Your Tutoring Needs