Ross Hopkins, president of Hopkins Hospitality, has developed the tasks, duratio

ID: 331839 • Letter: R

Question

Ross Hopkins, president of Hopkins Hospitality, has developed the tasks, durations, and predecessor relationships in the following table for building new motels.

(weeks )

Immediate

(weeks )

Immediate

Activity

a

m

b

Predecessor(s)

Activity

a

m

b

Predecessor(s)

A

44

88

1010

long dash—

G

22

33

44

C, E

B

22

99

2424

A

H

22

22

22

F

C

99

1212

1616

A

I

77

77

77

F

D

44

66

99

A

J

44

77

1212

D, G, H

E

11

22

44

B

K

11

11

44

I, J

F

55

88

2121

C, E

a) To find the expected activity time, the beta distribution weights the three time estimates as follows.

Expected Time equals StartFraction left parenthesis a plus 4 m plus b right parenthesis Over 6 EndFractionExpected Time=(a+4m+b)6

Calculate the expected (estimated) time for activity C.

Expected Time =

12.1712.17

weeks (Round your response to two decimal places.)

b) To compute the variance of activity completion time, use the following formula.

Variance equals left parenthesis StartFraction left parenthesis b minus a right parenthesis Over 6 EndFraction right parenthesis squaredVariance=(b?a)62

Calculate the variance for activity C.

Variance =

11

weeks (Round your response to two decimal places.)

Consider the AON network for the project.

font size increased by 1 Upper DD

font size increased by 1 Upper FF

font size increased by 1 Upper GG

font size increased by 1 Upper AA

font size increased by 1 Upper EE

font size increased by 1 Upper CC

font size increased by 1 Upper BB

font size increased by 1 Upper HH

font size increased by 1 Upper II

font size increased by 1 Upper KK

font size increased by 1 Upper JJ

x y graph

c) The length of the path

Upper A minus Upper B minus Upper E minus Upper F minus Upper H minus Upper J minus Upper KA ? B ? E ? F ? H ? J ? K

is

40.6740.67

weeks. (Round your response to two decimal places.)

The length of the path

Upper A minus Upper B minus Upper E minus Upper F minus Upper I minus Upper KA ? B ? E ? F ? I ? K

is

38.3438.34

weeks. (Round your response to two decimal places.)

The length of the path

Upper A minus Upper B minus Upper E minus Upper G minus Upper J minus Upper KA ? B ? E ? G ? J ? K

is

nothing

weeks. (Round your response to two decimal places.)

Time

(weeks )

Immediate

Time

(weeks )

Immediate

Activity

a

m

b

Predecessor(s)

Activity

a

m

b

Predecessor(s)

A

44

88

1010

long dash—

G

22

33

44

C, E

B

22

99

2424

A

H

22

22

22

F

C

99

1212

1616

A

I

77

77

77

F

D

44

66

99

A

J

44

77

1212

D, G, H

E

11

22

44

B

K

11

11

44

I, J

F

55

88

2121

C, E

Explanation / Answer

(a)

Expected activity time for 'C' = (a + 4m + b)/6 = (9+4*12+16)/6 = 12.167 weeks

(b)

Variance of activity time for 'C' = (b - a)2/36 = ((16 - 9)^2)/36 = 1.36

(c)

(d)

(e)

Activity a m b te=(a+4m+b)/6 A 4 8 10 7.67 B 2 9 24 10.33 E 1 2 4 2.17 F 5 8 21 9.67 H 2 2 2 2.00 J 4 7 12 7.33 K 1 1 4 1.50 Total 40.67