AE Manufacturing has 60 machine hours every day. AE Manufacturing two products,
ID: 329347 • Letter: A
Question
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changing over from producing product B to A, there is no change over time. When changing over from producing product A to B, it takes 8 machine hours. If the previous day ended with producing product B, what is the effective capacity when AE Manufacturing has the following schedule: product A, product B, product A.
56 machine hours per day
60 machine hours per day
44 machine hours per day
52 machine hours per day
56 machine hours per day
60 machine hours per day
44 machine hours per day
52 machine hours per day
Explanation / Answer
Given values:
Design capacity = 60 machine hours per day
Time taken from product B to A = 0 machine hours
Time taken from product A to B = 8 machine hours
Production schedule = A — B — A
Solution:
Previous day ended with Product B. Since, there is 0 changing over time from B to A, the new day will immediately begin with producing product A.
Beginning = Product A, changeover time = 0
Product A to B, changeover time = 8 machine hours
Product B to A, changeover time = 0 machine hours
Effective capacity = Design capacity — Total Change over time
Effective capacity = 60 — (0 + 8 + 0) = 52
Effective capacity = 52 machine hours per day