Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Sample size is 6. Using subgroups 1 to 15 complete the following: a.Construct an

ID: 3291655 • Letter: S

Question

Sample size is 6. Using subgroups 1 to 15 complete the following:

a.Construct an Xbar & R chart.

b.Does the process appear to be in control? Why or why not?

c If the optimum response time is 4.5 ± 1.3 minutes, use the estimated standard deviation that you calculate from the control chart information and calculate Cp, and Cpk. Explain what the indices tell you about the process

Sample

1

2

3

4

5

6

7

8

3.81

4.08

4.19

3.88

4.15

4.95

4.01

4.85

3.93

3.82

4.30

4.16

4.93

4.12

4.89

4.05

3.89

3.98

4.17

4.12

4.86

4.08

4.87

4.08

3.91

4.21

4.23

4.24

4.98

4.23

4.98

3.98

4.08

4.00

4.12

4.17

4.58

4.12

4.89

4.07

4.01

4.06

4.15

4.17

4.97

4.13

4.88

3.95

9

10

11

12

13

14

15

4.24

4.99

4.07

4.71

3.91

4.60

4.57

4.87

4.16

4.88

3.98

4.64

3.94

4.06

5.33

4.16

4.89

4.04

4.68

4.00

3.95

4.83

4.18

4.86

3.94

4.57

3.85

3.96

4.93

4.29

4.93

3.94

4.57

3.86

3.98

4.83

4.37

4.97

3.90

4.52

3.88

3.95

Sample size is 6. Using subgroups 1 to 15 complete the following:

a.Construct an Xbar & R chart.

b.Does the process appear to be in control? Why or why not?

c If the optimum response time is 4.5 ± 1.3 minutes, use the estimated standard deviation that you calculate from the control chart information and calculate Cp, and Cpk. Explain what the indices tell you about the process

Sample

1

2

3

4

5

6

7

8

3.81

4.08

4.19

3.88

4.15

4.95

4.01

4.85

3.93

3.82

4.30

4.16

4.93

4.12

4.89

4.05

3.89

3.98

4.17

4.12

4.86

4.08

4.87

4.08

3.91

4.21

4.23

4.24

4.98

4.23

4.98

3.98

4.08

4.00

4.12

4.17

4.58

4.12

4.89

4.07

4.01

4.06

4.15

4.17

4.97

4.13

4.88

3.95

9

10

11

12

13

14

15

4.24

4.99

4.07

4.71

3.91

4.60

4.57

4.87

4.16

4.88

3.98

4.64

3.94

4.06

5.33

4.16

4.89

4.04

4.68

4.00

3.95

4.83

4.18

4.86

3.94

4.57

3.85

3.96

4.93

4.29

4.93

3.94

4.57

3.86

3.98

4.83

4.37

4.97

3.90

4.52

3.88

3.95

Explanation / Answer

Part (a): Construction of Xbar-R Charts

Let Xbari and Ri be respectively the sample average and range

Calculated values of Xbari and Ri are given below:

Xbari

3.938333

4.025

4.193333

4.123333

4.745

Ri

0.27

0.39

0.18

0.36

0.83

4.753333

4.163333

4.838333

4.358333

4.766667

0.97

0.9

1.09

0.83

0.9

4.085

4.481667

4.021667

4.078333

0.81

0.77

0.75

0.62

From these, the following are obtained:

Xdouble bar

4.322889

Rbar

0.702667

A2(6)

0.483

D3(6)

0

D4(6)

2.004

d2(6)

2.534

[A2, D3, D4 and d2 are obtained from standard Control Chart Constants Table.]

LCL Xbar

Xdouble bar - A2Rbar

3.983501

UCL Xbar

Xdouble bar + A2Rbar

4.662277

LCL R

D3Rbar

0

UCL R

D4Rbar

1.408144

So,

Xbar chart has 3.984 and 4.663 as the limits and RChart has 0 and 1.408 as limits. ANSWER

Part (b)

Visually examining the xbari’s and Ri’s vis-à-vis the respective limits we find that

Process is under control with respect to range, but not with respect to Xbar. ANSWER

[Sub-group 1 has a lower Xbar, subgroups 5, 7, 9 and 11 have higher Xbar.]

Part (c)

Estimate of standard deviation = Rbar/d2 = 0.2773. ANSWER

Cp = Specification band/6SD = (2 x 1.3)/(6 x 0.2772) = 1.563 ANSWER 2

[2 x 1.3 is obtained from the given Specification limit: 4.5 ± 1.3 min]

Cpk = [Min{(mean - LSL), (USL - mean)}]/3SD

= [min{(4.322 – 3.2), (5.8 – 4.322)}]/(3 x 0.2773)

= [{min(1.122, 1.478)}]/0.8319 = 1.122/0.8319 = 1.349 ANSWER 3

Cp indicates whether or not the process is capable of meeting the specification and Cpk tells whether or not the process is centered between the specification limits. ANSWER

Xbari

3.938333

4.025

4.193333

4.123333

4.745

Ri

0.27

0.39

0.18

0.36

0.83