Is the process in control or out of control? Choose one. A) Out of control, beca
ID: 3217096 • Letter: I
Question
Is the process in control or out of control? Choose one.
A) Out of control, because there are nine consecutive points either above or below the mean
B) Out of control because two out of three consecutive points lie more than two standard deviations from the mean.
C) In control because none of the three warning signals detected a change
D) out of control, because a point lies more than three standard deviations beyond the mean.
Gears wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwweiwiw 0 1 2 3 4 5 6 7 8 9 10 11 Observation numberExplanation / Answer
as all 9 points lies inside 2 stdandrd deivation away;
hence C) In control because none of the three warning signals detected a change
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.