The data shown in Table 6E.4 are the deviations from nominal diameter for holes
ID: 3206523 • Letter: T
Question
The data shown in Table 6E.4 are the deviations from nominal diameter for holes drilled in a carbon-fiber composite material used in aerospace manufacturing. The values reported are deviations from nominal in ten-thousandths of an inch.
Estimate the process standard deviation using the range method. If specifications are at nominal ±100, what can you say about the capability of this process? Calculate PCR Cp.
Table 6E.4 Sample # x x x x x 1 -30 50 -20 10 30 2 0 50 -60 -20 30 3 -50 10 20 30 20 4 -10 -10 30 -20 50 5 20 -40 50 20 10 6 0 0 40 -40 20 7 0 0 20 -20 -10 8 70 -30 30 -10 0 9 0 0 20 -20 10 10 10 20 30 10 50 11 40 0 20 0 20 12 30 20 30 10 40 13 30 -30 0 10 10 14 30 -10 50 -10 -30 15 10 -10 50 40 0 16 0 0 30 -10 0 17 20 20 30 30 -20 18 10 -20 50 30 10 19 50 -10 40 20 0 20 50 0 0 30 10Explanation / Answer
the ranges are obtained for each of the 20 samples.
where range=max(x1,x2,x3,x4,x5)-min(x1,x2,x3,x4,x5)
the data obtained as
sample x1 x2 x3 x4 x5 range
1 -30 50 -20 10 30 80
2 0 50 -60 -20 30 110
3 -50 10 20 30 20 80
4 -10 -10 30 -20 50 70
5 20 -40 50 20 10 90
6 0 0 40 -40 20 80
7 0 0 20 -20 -10 40
8 70 -30 30 -10 0 100
9 0 0 20 -20 10 40
10 10 20 30 10 50 40
11 40 0 20 0 20 40
12 30 20 30 10 40 30
13 30 -30 0 10 10 60
14 30 -10 50 -10 -30 80
15 10 -10 50 40 0 60
16 0 0 30 -10 0 40
17 20 20 30 30 -20 50
18 10 -20 50 30 10 70
19 50 -10 40 20 0 60
20 50 0 0 30 10 50
then Rbar=mean of the ranges obtained=63.5
here each sample contains n=5 observations.
estimate of the process standard deviation is s=Rbar/d2
from table of constants of control charts for n=5 d2=2.326
hence estimated process standard deviation=63.5/2.326=27.300 [answer]
we have upper specification limit=USL=nominal+100
lower specification limit=LSL=nominal-100
PCR Cp=(USL-LSL)/6s=(nominal+100-nominal+100)/6s=200/(6*27.3)=1.22>1
it means that if the process is in the control, the quality of the products will automatically conform to the specifications desired. this signifies that the process is well in statistical control