Develop the activity sequence model and determine the normal time for the follow
ID: 3184532 • Letter: D
Question
Develop the activity sequence model and determine the normal time for the following work activity: . A worker walks 5 steps, picks up a small part from the or, returns to his original position, and places the part on his worktable. A worker takes 2 steps, grasp the waist-level feed lever on the lathe, pulls up the lever approximately 15 cm to engage the feed. Process time to turn the part is 7 sec. 2. A normal time allowance of 7% is given to these activities. What is the standard time of the operations? 3.Explanation / Answer
1 answer:
The series of actions followed by the being are:
1. Walk 5 steps - This activity of walk is represent by "A" in the table. and he walked 5 ladder. Row 10 correspond to 5,6,7 steps. Therefore "A10" is the action for this step.
2. After walking, to pick the object, he bend. - This acitvity of winding and then raising is represent by "B". He bend as well as rises with 100% occurance. So, Row 6 represent this. Hence "B6".
3. After twisting, he picks up the small thing. - This activity of gaining be in charge of over that small object is represent by "G1"
4. After pleasing so as to article, he walks back to similar position i.e 5 steps. - This once more in "A10"
5. After pending back he doesnt bend other than will stay with no group. - This activity is known by "B0".
6. Then he seats the thing on the table. - This activity of lay aside is given by "P1" as of the table.
7. Then no action - given through "A0"
So the action sequence replica is "A10 B6 G1 A10 B0 P1 A0"
The sum of all these index is 28.
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.