Determine which case would you use to solve the following problem: A contractor
ID: 3152398 • Letter: D
Question
Determine which case would you use to solve the following problem: A contractor claims that the joints spacing in a highway project have a standard deviation of 1.5 cm. An inspection of 12 joints at random yielded a sample standard deviation of 1.7 cm. Can it be said at the 5% level of significance that he delivered a project with a standard deviation greater than 1.5 cm?
(a) Case 1 of Confidence Intervals
(b) Case 2 of Confidence Intervals
(c) Case 3 of Confidence Intervals
(4) Case 4 of Confidence Intervals
(e) Case 1 of Hypothesis Tests, Question 3
(f) Case 4 of Hypothesis Tests, Question 3
Explanation / Answer
Determine which case would you use to solve the following problem: A contractor claims that the joints spacing in a highway project have a standard deviation of 1.5 cm. An inspection of 12 joints at random yielded a sample standard deviation of 1.7 cm. Can it be said at the 5% level of significance that he delivered a project with a standard deviation greater than 1.5 cm?
(f) Case 4 of Hypothesis Tests, Question 3
I will use a hypothesis test for Standard deviation!