One of the following is true Both upper and lower specification limits must be s
ID: 3059037 • Letter: O
Question
One of the following is true Both upper and lower specification limits must be stated for the CTQ Either upper or lower specification limits must be stated for the CTQ maybe stated or maybe not stated Both upper and lower specification limits is usually stated for the CTQ, but something one is on . The upper specification limit is must to be stated for the CTQ but the lower specification limit is is stated Question 2: True or false 1. The product that is containing a defect is defective product ( 2. The CTQ is the detailed feature of the product 3. We must play with uncontrollable inputs to draw back the out of control process to in control status ( 4. Juran is the first person who encourage to adopt a new philosophy, recognize that we are in a time of change, a new economic age( 5. Six sigma is introduced in 1986( 6·hSx Sigma methodology, we are looking to reduce variation of all features of the product 7. Lean helps identify anything not absolutely required to deliver a 8. The DFSS the system is robust ( 9. Phase ll of control chart application is a control limits(Explanation / Answer
One of the following is true Both upper and lower specification limits must be stated for the CTQ Either upper or lower specification limits must be stated for the CTQ maybe stated or maybe not stated Both upper and lower specification limits is usually stated for the CTQ, but something one is on . The upper specification limit is must to be stated for the CTQ but the lower specification limit is is stated Question 2: True or false 1. The product that is containing a defect is defective product ( 2. The CTQ is the detailed feature of the product 3. We must play with uncontrollable inputs to draw back the out of control process to in control status ( 4. Juran is the first person who encourage to adopt a new philosophy, recognize that we are in a time of change, a new economic age( 5. Six sigma is introduced in 1986( 6·hSx Sigma methodology, we are looking to reduce variation of all features of the product 7. Lean helps identify anything not absolutely required to deliver a 8. The DFSS the system is robust ( 9. Phase ll of control chart application is a control limits(
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.