Problem 4S-4 A product engineer has developed the following equation for the cos
ID: 3046673 • Letter: P
Question
Problem 4S-4 A product engineer has developed the following equation for the cost of a system component: C (10P2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of 3 identical components, all of which must operate for the system to operate. The engineer can spend $259 for the 3 components. What is the largest component probability that can be achieved? (Do not round your intermediate calculations. Round your final answer to 4 decimal places.) ProbabilityExplanation / Answer
Cost of a system component C=(10P)2
Engineer can spend $259 for the three component
Cost of 3 component = 3*(10P)2 = Selling of component
3*(10P)2 =259
(10P)2 =259/3
100 P2 = 86.3333
P=0.9291
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.