A factory’s power bill is $80,000 per year. The first cost of a small geothermal

ID: 3043918 • Letter: A

Question

A factory’s power bill is $80,000 per year. The first cost of a small geothermal power plant is normally distributed with a mean of $200,000 and a standard deviation of $50,000. The power plant has no salvage value. The interest rate for evaluation is 6%. The project’s life is from a discrete uniform distribution that takes on the values 3, 4, 5, 6, and 7 (the life is relatively short due to corrosion). The annual operating cost is expected to be around $15,000 per year. Using Excel’s RAND() function, simulate 25 iterations. What are the expected value and standard deviation of the present worth?

Explanation / Answer

Using Excel’s RAND() function, simulated 25 iterations are

1

0.772662

2

0.157237

3

0.302622

4

0.450614

5

0.149585

6

0.338689

7

0.394815

8

0.8761

9

0.523354

10

0.817087

11

0.312958

12

0.789227

13

0.544961

14

0.748309

15

0.148688

16

0.554748

17

0.285944

18

0.478734

19

0.132819

20

0.126846

21

0.967612

22

0.450345

23

0.797586

24

0.351478

25

0.877334

For calculating mean use the Excel function

                                  AVERAGE()

mean= 0.494014

For calculating SD use the Excel function

                             STDEV()

SD= 0.263662

1

0.772662

2

0.157237

3

0.302622

4

0.450614

5

0.149585

6

0.338689

7

0.394815

8

0.8761

9

0.523354

10

0.817087

11

0.312958

12

0.789227

13

0.544961

14

0.748309

15

0.148688

16

0.554748

17

0.285944

18

0.478734

19

0.132819

20

0.126846

21

0.967612

22

0.450345

23

0.797586

24

0.351478

25

0.877334

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote