An industrial chemical company has three facilities A, B, and C. Each facility p
ID: 2860853 • Letter: A
Question
An industrial chemical company has three facilities A, B, and C. Each facility produces polyethylene (PE), polyvinyl chloride (PVC), and polystyrene (PS). The table below gives the daily production output (in metric tons) for each facility. Give vectors a, b, and c that give the daily production amounts at each facility. Compute 15c. Describe what the entries tell us. Determine the combined output from all three facilities over 4-week period. Determine the number of days of production from each facility required to produce 170 metric tons of polyethylene, 290 metric tons of polyvinyl chloride and 250 metric tons of polystyrene.Explanation / Answer
d) Facility A = (170+ 290+250) / (10 + 20 + 10) = 710 / 40 = 17.75 days
Facility B = (170+ 290+250) / (30 + 50 + 50) = 710 / 130 = 5.46 days
Facility C = (170+ 290+250) / (20 + 30 + 30) = 710 / 80 = 8.875 days
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.