15.00 points Verizox Company uses a job order cost system with manufacturing ove
ID: 2609062 • Letter: 1
Question
15.00 points Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $184,240. Estimated direct labor cost was $458,720 for 18,800 hours. Actual costs for the most recent month are summarized here: Total Cost $45,873 Direct labor (1,880 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory insurance General and administrative salaries Selling expenses 2.470 3,360 3,280 4,710 5,760 1,210 1,730 4,280 5,400 Required: 1. Calculate the predetermined overhead rate. (Round your answer to 2 decimal places.) ined Overhead Rate Per DL Hour F3 FS F8Explanation / Answer
Indirect Labor
Indirect Material
Factory Rent
Factory Supervision
Factory Depreciation
Factory Janitorial Work
Factory Insurance
Actual Manufacturing Overhead Costs
Solution: 1. Predetermined overhead rate = $ 9.80 per direct labor hour Working Notes: Predetermined overhead rate = Estimated total manufacturing overhead cost / Total direct labor hours = $184,240 /18,800 =$ 9.80 per direct labor hour 2. Total manufacturing overhead applied = $18,424 Working Notes: Total manufacturing overhead applied = Total direct labor hours applied during the month x Pre determined manufacturing OH rate = 1,880 direct labor hours x $9.80 per direct labor hour = 1,880 x $9.80 = $18,424 3. Actual manufacturing overhead costs = $22,520 Working Notes:Indirect Labor
2,470Indirect Material
3,360Factory Rent
3,280Factory Supervision
4,710Factory Depreciation
$5,760Factory Janitorial Work
$1,210Factory Insurance
$1,730Actual Manufacturing Overhead Costs
22,520 4. Overhead Underapplied $4,096 Working Notes: Manufacturing Overhead A/c Actual (from 3.) $22,520 Applied $18,424 (calculation done no. 2.) Balance $4,096 (underapplied) Notes: Since actual manufacturing Overhead cost is higher than applied manufacturing overhead cost hence, it is underapplied by $4,096 Because , we applied at predetermined overhead rate not by actual rate. Please feel free to ask if anything about above solution in comment section of the question.Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.