onnecth Connes Homework Sweeten Company had no jobs in progress at the beginning
ID: 2604313 • Letter: O
Question
onnecth Connes Homework Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments-Molding and Fabrication lt started, completed, and sold only two jobs during March-Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March 2, 500 10,000 15,000 $25,000 1,500 4, 00 Estisated total machine-hours used Estimated total fixed manufacturing overhead Estinated variable manufacturing overhead per nachine-hour 1.40 2.20 Direct materials Direct labor cost Actual machine-hours used: Moldin Fabrication Total 413, 000 , 000 21,000 7,500 1,700800 900 600 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required For questons 1-8, assume that Sweeten Company uses a plantwdt predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume thet the company uses departmental predetermined overhend rates with machine-hours as the allocation bese in both departments 11. How much manufacturing overhead was applied from the Fabrication Department to Job P and how much was applied to Job Q? Do not round Intermedliate calculetlons.) Prev 11 12 13-15 0,19 m Next > hpExplanation / Answer
Predetermined overhead rate: Molding 5.4 =(10000/2500)+1.4 Fabrication 12.2 =(15000/1500)+2.2 Manufacturing overhead applied: Job P 16500 =(1700*5.4)+(600*12.2) Job Q 15300 =(800*5.4)+(900*12.2)
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.