Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

an important tool in predicting the an important tool in predicting the an impor

ID: 2574291 • Letter: A

Question

an important tool in predicting the an important tool in predicting the an important tool in predicting the Connect CSecure https://newconnect.mheducation.com/flow/connect.html Sectional Exam 2-Chapters 4,5,6 6 Saved When graphing cost-volume-profit data on a CVP chart Multiple Choice 00.54:34 Data points always represent expected future points Units are plotted on the vertical axis, costs on the horizontal axis Both units and costs are plotted on the horizontal axis Both units and cost are plotted on the vertical axis Pea 22 of 33 iii Next

Explanation / Answer

IN CVP chart, expected units are plotted on x axis (horizontal), while costs are plotted on vertical (Y axis)

So correct answer is E.