07236768187akey B82adfab4cabe32e1edIda1368686c5f8iqid-132527015194433668sid-1325
ID: 2557164 • Letter: 0
Question
07236768187akey B82adfab4cabe32e1edIda1368686c5f8iqid-132527015194433668sid-13252708334450813 dil connect Ths window shows your responses and whar was marked correct and incorrect from your previous attempt 6. Award: O out of 10.00 points Which of the following is NOT true for variable manufecturing ovarhead costs in a standard costng system? O No volume variance is ever reported ? The fle ible variable overhead alowance for the standard hours slo ed for the output ste some as t pied total vanalle over ead O The siope of the budgeted veriable overhead Ine is the same as the slope of the appled variable overhe ed line Any underapled or over applied overhead is equal to the vsable ?emead spend ngwrece O Type here to searchExplanation / Answer
Answer is
Any underapplied or overapplied overhead is equal to the variable overhead spending variance
Except this remaining three are related to variable manufacturing overhead cost
Variable manufacturing cost change with production units if production increased variable cost increased if it is decreased then variable manufacturing overhead cost is decreased
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.