Johnson industries manufactures three models of a product in a single plant with

ID: 2491861 • Letter: J

Question

Johnson industries manufactures three models of a product in a single plant with two departments: Cutting and Assembly. The company has estimated costs for each of the three products models, the Zp, the Flash, and the imperial models. Prepare a direct labor budget for the upcoming year that shows the budgeted direct labor costs for each department and for company as a whole Prepare the direct labor budget for the Cutting Department, then the Assembly Department, and finally the company as a whole.

Explanation / Answer

We can use the given tables to prepare budgets

Cutting department

Zips

Flashes

Imperials

Total

Units to be produced

640

770

890

Multiply by direct labor hours per unit

1.2

1.8

1.6

total cutting hours required

768

1386

1424

Multiply by direct labor cost per hour

10

10

10

Budgeted Direct Labor cost

7680

13860

14240

35780

Assembly department

Zips

Flashes

Imperials

Total

Units to be produced

640

770

890

Multiply by direct labor hours per unit

2.7

2.8

2.9

total cutting hours required

1728

2156

2581

Multiply by direct labor cost per hour

11

11

11

Budgeted Direct Labor cost

19008

23716

28391

71115

Zips

Flashes

Imperials

Total

Units to be produced

640

770

890

Multiply by direct labor hours per unit

1.2

1.8

1.6

total cutting hours required

768

1386

1424

Multiply by direct labor cost per hour

10

10

10

Budgeted Direct Labor cost

7680

13860

14240

35780