Orion Devices Inc. is considering a new just-in-time product cell. The present m
ID: 2477592 • Letter: O
Question
Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 80 units. The process time for each step is as follows:
The time required to move each batch between steps is 17 minutes. In addition, the time to move raw materials to Process Step 1 is also 17 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 17 minutes.
The new just-in-time layout will allow the company to reduce the batch sizes from 80 units to 5 units. The time required to move each batch between steps and the inventory locations will be reduced to 3 minutes. The processing time in each step will stay the same.
Determine the value-added, non-value-added, total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.
Process Step 1 6 minutes Process Step 2 9 minutes Process Step 3 4 minutes Process Step 4 8 minutesExplanation / Answer
27 MIN
( 6 + 9 + 4 + 8)
27 MIN
( 6 + 9 + 4 + 8)
34 MIN
(17 + 17)
6 MIN
(3 + 3)
51 MIN
(17 + 17 + 17)
9 MIN
(3 + 3 + 3)
24.11%
(27MIN / 112 MIN)
64.29%
(27MIN / 42MIN)
VALUE ADDED RATIO = VALUE ADDED TIME / TOTAL TIME TO COMPLETE THE DELIVERY
DESCRIPTION PRESENT APPROACH PROPOSED APPROACH VALUE ADDED TIME27 MIN
( 6 + 9 + 4 + 8)
27 MIN
( 6 + 9 + 4 + 8)
NON VALUE ADDED TIME34 MIN
(17 + 17)
6 MIN
(3 + 3)
LEAD TIME51 MIN
(17 + 17 + 17)
9 MIN
(3 + 3 + 3)
VALUE ADDED RATIO24.11%
(27MIN / 112 MIN)
64.29%
(27MIN / 42MIN)