5,800 The question is : 1) What is the company’s plantwide overhead rate? 2) Usi
ID: 2447003 • Letter: 5
Question
5,800
The question is :
1) What is the company’s plantwide overhead rate?
2) Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z?
3) What is the activity rate for the Machining activity cost pool?
4) What is the activity rate for the Machine Setups activity cost pool?
5) What is the activity rate for the Product Design activity cost pool?
6) What is the activity rate for the General Factory activity cost pool?
7) Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
8) Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
9) Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z?
10) Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z?
11) Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z?
12) Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?
13) Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z?
Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 213,400 11,000 MHs Machine setups Number of setups $ 61,600 140 setups Production design Number of products $ 78,000 2 products General factory Direct labor-hours $ 244,000 13,200 DLHsExplanation / Answer
In the below table I have answered most of the parts are answered. Kindly Read the answer carefully 54.27 Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Cost per Activity No of Activity of Y Cost of Y for each Activity % Of Cost of Y in relation to total cost No of Activity of Z Cost of Z for each Activity % Of Cost of Z in relation to total cost Machining Machine-hours 213,400.00 11,000.00 MHs 19.40 6,400.00 124,160.00 58.18% 4,600.00 89,240.00 41.82% Machine setups Number of setups 61,600.00 140.00 setups 440.00 60.00 26,400.00 42.86% 80.00 35,200.00 57.14% Production design Number of products 78,000.00 2.00 products 39,000.00 1.00 39,000.00 50.00% 1.00 39,000.00 50.00% General factory Direct labor-hours 244,000.00 13,200.00 DLHs 18.48 7,400.00 136,787.88 56.06% 5,800.00 107,212.12 43.94% 597,000.00 24,342.00 326,347.88 270,652.12 1) Nothingis given in Question so I am assuming plantwide rate is computed on basis of Mach hr Plantwide O/H Rate = 597,000/11,000 Plantwide O/H Rate = 54.27 2) Particulars Y Z Machine-hours 6,400.00 4,600.00 PlantwideO/H rate 54.27 54.27 Total Cost 347,345.45 249,654.55