2.4 The following is a list of the assets and claims of Crafty Engineering as at
ID: 2430581 • Letter: 2
Question
2.4 The following is a list of the assets and claims of Crafty Engineering as at 30 June last year:
Trade payables 86
Motor vehicles 38
Long-term borrowing from Industrial Finance Company 260
Equipment and tools 207
Short-term borrowings 116
Inventories 153
Property 320
Trade receivables 185
Required:
(a) Prepare the statement of financial position of the business as at 30 June last year from
the above information using the standard layout. (Hint: There is a missing item that
needs to be deduced and inserted.)
(b) Discuss the significant features revealed by this financial statement.
2.1 On Thursday, the fourth day of his business venture, Paul, the street trader in wrapping
paper (see earlier in the chapter, pages 29–37), bought more inventories for £53 cash.
During the day he sold inventories that had cost £33 for a total of £47.
Required:
Draw up the three financial statements for Paul’s business venture for Thursday
Explanation / Answer
2.4) a.
b. The statement of financial position reveals a high level of investment in non-current assts with more then 60% of total assets being non-current. This may be due to the fact that an engineering business may require heavy investment in non-current assets. Current assets are higher than current liabilities resulting in 1.7 times more current assets. The statement of financial position does highlights that Craft Engineering has no cash and appears to be dependent on short term borrowing.
Crafty Engineering Statement of Financial Position as at 30th June 2017 ASSETS Non-Current Assets Property 320 Equipments 207 Motor Vehicles 38 565 Current Assets Inventories 153 Trade Receivables 185 338 Total Assets 903 EQUITY AND LIABILITIES Equity (which is the missing figure) 441 Non-Current Liabilities Long-term Borrowings 260 Current Liabilities Trade Payables 86 Short-term Borrowings 116 202 Total Equity and Liabilities 903Related Questions
Navigate