Erte, Inc., manufactures two models of high-pressure steam valves, the XR7 model and the ZD5 model. Data regarding the two products follow:
The company has always used direct labor-hours as the base for applying manufacturing overhead cost to products. Manufacturing overhead totals $1,621,800 per year.
Product XR7 is more complex to manufacture than product ZD5 and requires the use of a special milling machine.
Because of the special work required in (d) above, the company is considering the use of activity-based costing to apply overhead cost to products. Three activity cost pools have been identified and the first-stage allocations have been completed. Data concerning these activity cost pools appear below:
Estimated Total Activity
Compute the predetermined overhead rate. (Round your answer to the nearest dollar amount. Omit the "$" sign in your response.)
Determine the unit product cost of each product. (Round pre-determined overhead rate to nearest dollar amount. Round other intermediate answers and the final answer to two decimal places. Omit the "$" sign in your response.)
Compute the activity rate for each activity cost pool. Also, compute the amount of overhead cost that would be applied to each product. (Round your overhead cost per unit to 2 decimal places. Omit the "$" sign in your response.)
Determine the unit product cost of each product. (Round your intermediate and final answers to 2 decimal places. Omit the "$" sign in your response.)
Erte, Inc., manufactures two models of high-pressure steam valves, the XR7 model and the ZD5 model. Data regarding the two products follow:
Explanation / Answer
Answer 1. a. Predetermined Overhead Rate = $1621800 (Total Overhead) / 39300 (Total Direct Labour hrs) Predetermined Overhead Rate = $41.27 per labor hr. or $41 per labor hr. Answer b. Calculation of Total Cost Under Traditional Costing Model XR7 ZD5 Direct Material $39 $21 Direct labor 25 35 Overhead XR7- $41 X 0.5 Hrs 21 ZD5 - $41 X 0.7 Hrs 29 Total Unit Cost 85 85 Answer 2. a. Activity Cost Pool Estimated Overhead Expected use of Cost Drivers Activity-Based Overhead rate Machine Setups 167,200 220 760.00 Per setup Special miling 275,600 1060 260.00 per machine hour General factory 1,179,000 39300 30.00 per direct labor hr Total Overhead 1,621,800 Alocation of Overhead Cost Under ABC Particulars Model Total XR7 ZD5 Machine Setups 66,880 100,320 167,200 Special miling 275,600 - 275,600 General factory 360,000 819,000 1,179,000 Total 702,480 919,320 1,621,800 No. of Units 24000 39000 Overhead Cost per Unit 29 24 Calculation of Total Cost Under ABC Model XR7 ZD5 Direct Material $39 $21 Direct labor 25 35 Overhead 29 24 Total Unit Cost 93 80