Spin Cycle Company uses three activity pools to apply overhead to its products.
ID: 2408450 • Letter: S
Question
Spin Cycle Company uses three activity pools to apply overhead to its products. Each activity has a cost driver used to allocate the overhead costs to the product. The activities and related overhead costs are as follows: product design $44,000; machining $330,000; and material handling $110,000. The cost drivers and expected use are as follows. Expected Use of Cost Drivers per Activity Cost Drivers Product design Machining Material handlingNumber of set-ups Activities Number of product changes Machine hours 10 153,000 94 Calculate the predetermined overhead rate for each activity. (Round answers to 2 decimal places, e.g. 15.25.) Activit Overhead Rate Product design Machining Material handling per product change per machine hr per set-up Classify each of these activities as unit-level, batch-level, product-level, or facility-level Product design Machining Material handlingExplanation / Answer
A). Predetermined rate computation for each activity:
1.Predetermined rate for Product Design =$44000/10 = $4400 per product change
2. Predetermined rate for machining = $330000/153000 = $2.16 per machine hour
3.Predetermined rate for machine handling = $110000/94 = $ 1170 per set up.
B)The Production Design is of Product Level
The Machining is of Unit Level
The material handlin is of Batch level
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.