Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Spin Cycle Company uses three activity pools to apply overhead to its products.

ID: 2408450 • Letter: S

Question

Spin Cycle Company uses three activity pools to apply overhead to its products. Each activity has a cost driver used to allocate the overhead costs to the product. The activities and related overhead costs are as follows: product design $44,000; machining $330,000; and material handling $110,000. The cost drivers and expected use are as follows. Expected Use of Cost Drivers per Activity Cost Drivers Product design Machining Material handlingNumber of set-ups Activities Number of product changes Machine hours 10 153,000 94 Calculate the predetermined overhead rate for each activity. (Round answers to 2 decimal places, e.g. 15.25.) Activit Overhead Rate Product design Machining Material handling per product change per machine hr per set-up Classify each of these activities as unit-level, batch-level, product-level, or facility-level Product design Machining Material handling

Explanation / Answer

A). Predetermined rate computation for each activity:

1.Predetermined rate for Product Design =$44000/10 = $4400 per product change

2. Predetermined rate for machining = $330000/153000 = $2.16 per machine hour

3.Predetermined rate for machine handling = $110000/94 = $ 1170 per set up.

B)The Production Design is of Product Level

The Machining is of Unit Level

The material handlin is of Batch level

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote