Exercise 16-4 Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.75 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $ (a) $84,600 $69,950 Direct labor 50,000 147,400 (h) Manufacturing overhead applied 32,500 (d) (i) Total manufacturing costs 151,150 (e) 220,100 Work in process 1/1/17 (b) 17,900 18,500 Total cost of work in process 211,300 (f) (j) Work in process 12/31/17 (c) 16,700 (k) Cost of goods manufactured 196,700 (g) 227,700
Explanation / Answer
Calculate missing amount :
Case A Case B Case C Direct material used a) 68650 84600 69950 Direct labour 50000 147400 h) 91000 Manufacturing overhead applied 32500 d) 95810 i) 59150 Total manufacturing cost 151150 e) 327810 220100 Work in process 1/1/17 b) 60150 17900 18500 Total cost of work in process 211300 f) 345710 j) 238600 Work in process 12/31/17 c) -14600 16700 k) -10900 Cost of goods manufactured 196700 g) 329010 227700Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.