Which of the following is an example of value-added time? Question 1 options: Pr

ID: 2390409 • Letter: W

Question

Which of the following is an example of value-added time?
Question 1 options:
Processing time
Wait time during inspection
Wait time in inventory
Both B and C


The just-in-time (JIT) philosophy attempts to reduce setup times, which will:
Question 3 options:
increase batch sizes
not affect batch sizes
increase within-batch wait time
decrease within-batch wait time

What do just-in-time (JIT) manufacturers demand from their vendors?
Question 4 options:
High quality materials
Low cost materials
On-time deliveries
All of the above

Objectives of just-in-time (JIT) manufacturing include:
Question 6 options:
eliminating waste
increasing inventory levels
increased number of inspections
all of the above

Inventory reduction is a ____ principle.
Question 7 options:
just-in-time
traditional processing
economic
wait time

Explanation / Answer

Wait time in inventory increase within-batch wait time On-time deliverieincreasing inventory levels traditional processing