Puget World, Inc., manufactures two models of television sets, the N 800 XL mode
ID: 2377717 • Letter: P
Question
Puget World, Inc., manufactures two models of television sets, the N 800 XL model and the N 500 model. Data regarding the two products follow:
Model N 800 XL requires $73 in direct materials per unit, and Model N 500 requires $52.
The company has always used direct labor-hours as the base for applying manufacturing overhead cost to products.
Model N 800 XL is more complex to manufacture than Model N 500 and requires the use of special equipment. Consequently, the company is considering the use of activity-based costing to assign manufacturing overhead cost to products. Three activity cost pools have been identified as follows:
Expected Activity
Required:
Compute the activity rate for each activity cost pool. (Round your answers to 2 decimal places.)
Determine the amount of overhead cost that would be assigned to each model using the activity-based costing system. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
Compute the unit product cost of each model. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
Puget World, Inc., manufactures two models of television sets, the N 800 XL model and the N 500 model. Data regarding the two products follow:
Puget World, Inc., manufactures two models of television sets, the N 800 XL model and the N 500 model. Data regarding the two products follow: Additional information about the company follows:Explanation / Answer
1.
Assume that the company continues to use direct labor-hours as the base for applying overhead cost to products.(Do not round intermediate calculations.Round your answers to 2 decimal places.)
a.
Compute the predetermined overhead rate.
Predetermined overhead rate
$ per DLH
b.
Compute the unit product cost of each model.
Model N 800 XL
$
Model N 500
$
check my workreferencesebook & resources
8.
value:
12.50 points
2.
Assume that the company decides to use activity-based costing to assign manufacturing overhead cost to products.
a(1)
Compute the activity rate for each activity cost pool. (Round your answers to 2 decimal places.)
Machine setup
$
per setup
Special processing
$
per MH
General factory
$
per DLH
a(2)
Determine the amount of overhead cost that would be assigned to each model using the activity-based costing system. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
Model N 800 XL
Model N 500
Overhead cost per unit
$
$
b.
Compute the unit product cost of each model. (Do not round intermediate calculations. Round your answers to 2 decimal places.)
Model N 800 XL
Model N 500
Unit product cost
$
$
1.
Assume that the company continues to use direct labor-hours as the base for applying overhead cost to products.(Do not round intermediate calculations.Round your answers to 2 decimal places.)
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.