Kunkel Company makes two products and uses a conventional costing system in whic

ID: 2339588 • Letter: K

Question

Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow: Wurcon $ 15.00 13.00 $ 6.00 9.00 3.05 4,000 Mercon Direct materials cost per unit Direct labor cost per unit Direct labor-hours per unit Number of units produced 0.40 2,000 These products are customized to some degree for specific customers Required: 1. The company's manufacturing overhead costs for the year are expected to be $520,000. Using the company's conventional costing system, compute the unit product costs for the two products 2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year: Mercon 4,000 Total 8,000 Wurcon Engineering design time (in hours) 4,000 Compute the unit product costs for the two products using the proposed ABC system (For all requirements, do not round intermediate calculations. Round your final answers to 2 decimal places.) Mercon Wurcon 1. Unit product cost under conventional system 2. Unit product cost under ABC system

Explanation / Answer

Overhead rate = 520000/13000 = 40 per labour hour

1) Unit product cost under Conventional system

2) Unit product cost under ABC system

Mercon Wurcon Direct material 15 13 Direct labour 6 9 Overhead per unit 40*.40 = 16 40*3.05 = 122 Total unit product cost 37 144