Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint m

ID: 2333187 • Letter: T

Question

Two-Stage ABC for Manufacturing
Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity cost pools and cost driver levels for the latest period:

Activity Cost Driver

    2,500 setup hours

5,000 material moves

  20,000 machine hours

The following data are for the production of single batches of two products, Mirlite and Subdue:

Determine the batch and unit costs per gallon of Mirlite and Subdue using ABC.
Round cost per gallon to two decimal places.

Mirlite

Subdue

Activity Cost Pool Activity Cost

Activity Cost Driver

Machine setup $990,000

    2,500 setup hours

Material handling 860,000

5,000 material moves

Machine operation 200,000

  20,000 machine hours

Explanation / Answer

Answer

Activity Cost Pool

Activity Cost

Activity Cost Driver

Activity Rate per driver

Machine setup

$                        990,000.00

              2,500

$                                           396.00 per setup hrs

Material handling

$                        860,000.00

              5,000

$                                           172.00 per material move

Machine operation

$                        200,000.00

           20,000

$                                              10.00 per machine hour

Product Costs

Mirlite

Subdue

Direct materials

$                        390,000.00

$           190,000.00

Direct labor

$                          10,500.00

$               8,000.00

Manufacturing overhead:

Machine setups

$                           5,940.00

$               4,752.00

Material handling

$                          10,320.00

$               6,020.00

Machine operation

$                           8,000.00

$               2,500.00

Total cost per batch

$                        424,760.00

$           211,272.00

Gallons produced

                                 50,000

                    30,000

Cost per gallon

$                                  8.50

$                     7.04

Product Costs

Mirlite

Subdue

Direct materials

390000

190000

Direct labor

10500

8000

Manufacturing overhead:

Machine setups

=15*396

=12*396

Material handling

=60*172

=35*172

Machine operation

=800*10

=250*10

Total cost per batch

Total (A)

Total (A)

Gallons produced

50000 (B)

30000 (B)

Cost per gallon

A / B

A / B

Activity Cost Pool

Activity Cost

Activity Cost Driver

Activity Rate per driver

Machine setup

$                        990,000.00

              2,500

$                                           396.00 per setup hrs

Material handling

$                        860,000.00

              5,000

$                                           172.00 per material move

Machine operation

$                        200,000.00

           20,000

$                                              10.00 per machine hour