ag Coupons, Promox CH4HW Home IChegg.com ×YO(22) Hip hop instrumenta C | Not sec
ID: 2332926 • Letter: A
Question
ag Coupons, Promox CH4HW Home IChegg.com ×YO(22) Hip hop instrumenta C | Not secure l eztO.mheducation.com/hm.tpx?--0.5766358261 300828_1536976472078 value 2.85 points Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost Estimated Total Cost Activity Cost Pools Machining Setup Quality control Estimated Cost Driver 318,000 12,100 machine hours 76.000 103.000 420 batches 730 inspections Suppose the Speedy boat requires 2.700 machine hours, 108 batches, and 360 inspections Using the activity rates, determi calculations to 2 decimal places and your final answers to the nearest dollar amount.) Cost Pool Allocated Overhead Setup Costs Quality Control Total Overhead Worksheot dBus 202 Research. docxExplanation / Answer
Calculation of allocated overhead :
Allocated machining cost = [Total machining cost/ Total Machine hours]*Required machine hours
= [318000/12100]*2700 = 70958.67 i.e. 70959
Allocated batches setup cost = [Total setup cost/Total Batches]*Required batches
= [76000/430]*108 =19088.37 i.e 19088
Allocated quality control inspection cost = [Total quality control cost/Total inspection]*Required inspections
= [103000/730]*360 = 50794.52 i.e. 50795
Cost Pool
Allocated Overhead
Machining
70959
Setup cost
19088
Quality control
50795
Total Overhead
140842
Cost Pool
Allocated Overhead
Machining
70959
Setup cost
19088
Quality control
50795
Total Overhead
140842
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.