Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

ag Coupons, Promox CH4HW Home IChegg.com ×YO(22) Hip hop instrumenta C | Not sec

ID: 2332926 • Letter: A

Question

ag Coupons, Promox CH4HW Home IChegg.com ×YO(22) Hip hop instrumenta C | Not secure l eztO.mheducation.com/hm.tpx?--0.5766358261 300828_1536976472078 value 2.85 points Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost Estimated Total Cost Activity Cost Pools Machining Setup Quality control Estimated Cost Driver 318,000 12,100 machine hours 76.000 103.000 420 batches 730 inspections Suppose the Speedy boat requires 2.700 machine hours, 108 batches, and 360 inspections Using the activity rates, determi calculations to 2 decimal places and your final answers to the nearest dollar amount.) Cost Pool Allocated Overhead Setup Costs Quality Control Total Overhead Worksheot dBus 202 Research. docx

Explanation / Answer

Calculation of allocated overhead :

Allocated machining cost = [Total machining cost/ Total Machine hours]*Required machine hours

= [318000/12100]*2700 = 70958.67 i.e. 70959

Allocated batches setup cost = [Total setup cost/Total Batches]*Required batches

= [76000/430]*108 =19088.37 i.e 19088

Allocated quality control inspection cost = [Total quality control cost/Total inspection]*Required inspections

= [103000/730]*360 = 50794.52 i.e. 50795

Cost Pool

Allocated Overhead

Machining

70959

Setup cost

19088

Quality control

50795

Total Overhead

140842

Cost Pool

Allocated Overhead

Machining

70959

Setup cost

19088

Quality control

50795

Total Overhead

140842