At which phase of desgin can an estimator or cost engineer have the greatest imp
ID: 2312328 • Letter: A
Question
At which phase of desgin can an estimator or cost engineer have the greatest impact on a project's cost? (Check only one ) - conceptual design - schematic desgin - desgin development - construction documentsAt which phase of desgin can an estimator or cost engineer have the greatest impact on a project's cost? (Check only one ) - conceptual design - schematic desgin - desgin development - construction documents
- conceptual design - schematic desgin - desgin development - construction documents
Explanation / Answer
At construction document phase of design an estimator or cost engineer have greatest impact on projects cost
After conceptual design and development when we documented the construction work then we analyse correctly what the things, resources, equipment required and we analyse cost of each individual work.
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.