Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Parcel map Cross-section As-built plans Utility trench plans Tentative Subdivisi

ID: 2310999 • Letter: P

Question

Parcel map

Cross-section

As-built plans

Utility trench plans

Tentative

Subdivision map

Final

Individual site plan

Profile

Grading plan

Landscaping map

Master plan

a) Project engineers use tentative maps and “Conditions of Approval” to prepare a ______________________.

b) A _______________________________ shows exact legal location and description of plots of land.

c)

A condominium map is an example of the _________ map prepared after obtaining the approvals.

d) A ____________________ is required to sculpt and compact the site so that storm water easily drains away

from the structures and streets.

e) ______________________ shows a lot with the setbacks, easements, and footprint of a detached home.

Explanation / Answer

a) Parcel Map

b) Landscaping map

c) Subdivision map

d) Utility trench plans

e) Master plan