27) 2.2 choose correct diagram A B C or D and short explanation why other option
ID: 2293943 • Letter: 2
Question
27) 2.2
choose correct diagram A B C or D
and short explanation why other options will not work
first picture data sheet
Second pictures diagrams
diagrams
le Controllers 343 Chapter 27-Prog Selector Switch Line Diagram to PLC Diagram Conversion. Use the Device Equivalents table to complete the PLC programming diagram. All hard-wired NO switches are programmed as NC. All hard-wired NC switches are programmed as NO. 2. Draw a basic PLC programming diagram of the standard line diagram. ON OFF DEVICE EQUIVALENTS SELECTOR SWITCH INPUT 1 LEVEL SWITCH 1 = INPUT 2 LEVEL SWITCH 2 = INPUT 3 PUSHBUTTON 1 = INPUT 4 PUSHBUTTON 2 = INPUT 5 OLS INPUT 6 FILL LS1 OLs M1 PUMP STARTER FILL SOLENOID OUTPUT 1 OPEN SOLENOID OUTPUT 2 PUMP STARTER OUTPUT 3 LS2 PB2 PB1Explanation / Answer
Answer : A is right
Because
in first line input 1 is output; in the second line input 6 is ols is output; in the third line both are inputs.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.