You have been asked to evaluate the economic implications of various methods for
ID: 2082752 • Letter: Y
Question
You have been asked to evaluate the economic implications of various methods for cooling condenser effluents from a 200-MW steamelectric plant. There are two basic types of cooling towers: wet and dry. Furthermore, heat may be removed from condenser water by (1) forcing (mechanically) air through the tower or (2) allowing heat transfer to occur by making use of natural draft. Consequently, there are four basic cooling tower designs that could be considered. Assuming that the cost of capital to the utility company is 12% per year, your job is to recommend the best alternative (i.e., the least expensive during the service life). Further assume that each alternative is capable of satisfactorily removing waste heat from the condensers of a 200-MW power plant. What noneconomic factors can you identify that might also play a role in the decision-making process? BEB Click the icon to view the alternatives description. Click the icon to view the interest and annuity table for discrete compounding when i 12% per year Data Table Alternative Wet Tower Wet Tower Dry Tower Dry Tower Mech. Draft Natural Draft Mech. Draft Natural Draft nitial cost $2.9 million $9.1 million $5.1 million $9.0 million 40 200-hp I.D. fans None Power for I.D. fans 20 200-hp I.D. fans None Power for pumps 20 150-hp pumps 40 100-hp pumps 20 150-hp pumps 40 100-hp pumps Mechanical maint $0.16 million $0.11 million $0.13 million $0.12 million Service life 30 years 30 years 30 years 30 years Market value 100 hp 74.5 cost of power to plant is 2.2 cents per kWh or kilowatt-hour; induced-ciraft fans and pumps operate around the clock for 365 daysyear (continuously). Assume that electric motors for pumps and fans are 90% efficient.Explanation / Answer
The following cases were addressed:
- Coal-fired steam plant
- Nuclear steam plant
- Gas-fired combined-cycle plant
- Coal-fired steam plant
- Nuclear steam plant
- Coal-fired steam plant
- Gas-fired combined-cycle plant
- Nuclear steam plant
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.