16) What would not be a management goal for facilities design? a) Reduce unit co

ID: 2074949 • Letter: 1

Question

16) What would not be a management goal for facilities design? a) Reduce unit cost Increase inventory c) Make work easier d) Reduce floor space e) All of the above 17) Which of the following is not a condition for determining a time standard? a) Qualified operator b) Working at a slow pace c) Performing a specific task d) None of the above 18) Line balancing is not used for: areating bottlenecks b) Smoothing variation c) Remove excess capacity d) Leveling the work load 19) Which of the following is considered a type of waste in manufacturing? a) Inventory b) Transportation c) Motion d) Rework Il of the above 20) If I have a standard time for an operation that is 0.235 minutes then how many pieces per hour can produce in and 8-hour shift at 80% efficiency? a) 1,364 b) 1,634 c) 90.24 d) 3,467

Explanation / Answer

1.Ans: B,The question streat forward says that what would not be management goals. It's of course increasing inventory.

2.Ans:B, Time Standard is the factor that we consider while calculating a specific time for a particular task.

Working at slow pace is not an option to calculate time standard. Working at Norma pace would be the option. Not too slow , not too fast.

3) Ans: A, line balancing its name suggests that, whole task decides into eqaup parts i.e. balanced. Creating Bottlenecks doesn't fits into this. As all the below options are realated to this only.

4)Ans: E, This is the correct option. All of the above. This all are the waste in manufacturing.