1. The town of Camp Verde has been directed to upgrade its primary WWTP to a sec
ID: 1827506 • Letter: 1
Question
1.
The town of Camp Verde has been directed to upgrade its primary WWTP to a
secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 30 mg/L of
suspended solids. They have selected a completely mixed activated sludge system for the
upgrade. The existing primary treatment plant has a flowrate of 0.029m3/s. The effluent
from the primary tank has a BOD5 of 240mg/L. Using the following assumptions,
estimate the required volume of the aeration tank:
(a). BOD5 of the effluent suspended solids is 70 percent of the allowable suspended
solids concentration.
(b). Growth constants values are estimated to be: Ks = 100mg/L BOD5; kd= 0.025 d-1;
Explanation / Answer
BOD5 allowed = soluble BOD5 (S) + suspended solid BOD5
25 mg/L = S + 0.70 (30 mg/L SS)
S = 25-0.70*30
S = 4 mg/L
Also
S =Ks*(1 + kd*?c )/(?c (Yk ? k d ) ? 1)
4 = 100*(1+0.025*?c)/?c*(10d^-1 - 0.025d^-1)
?c = d/(0.375)
?c = 2.67
Now,
X = ?c* Y ( So ? S )/? (1 + kd*?c)
= 2.67*0.8*(240-4)/?(1+0.06675)
X = 3000
? = 0.157
d = 3.7 hrs
V = 3.7*3600*0.029
= 387 m^3
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.