For all problems of this assignment consider Nuclear Power Plant (NPP) with Pres
ID: 1767946 • Letter: F
Question
For all problems of this assignment consider Nuclear Power Plant (NPP) with Pressurized water reactor (PWR). Reactor have following parameters:
Reactor Thermal Power
3000 MWth
Nuclear Power Plant has thermal efficiency
33%
Working Period Between Annual Outages
(Annual refueling and maintanance)
300 Effective Full-Power Days
(EFPD)
Of all Fissions (100%):
Contribution of U-235 fissions:
Contribution of Pu fissions:
65%
35%
Energy produced at each fission of U-235
200 MeV / atom
Conversion Factor
1.6 x 10-19 J/eV
Avogadro Constant
6.023 x 1023 J/eV
Initial Fuel Enrichment (wt% of U-235):
4.0%
Remaining content of U-235 in fuel (wt% of U-235):
1.0%
Amount of uranium that undergo fission in the fuel
4.0%
Reactor Thermal Power
3000 MWth
Nuclear Power Plant has thermal efficiency
33%
Working Period Between Annual Outages
(Annual refueling and maintanance)
300 Effective Full-Power Days
(EFPD)
Of all Fissions (100%):
Contribution of U-235 fissions:
Contribution of Pu fissions:
65%
35%
Energy produced at each fission of U-235
200 MeV / atom
Conversion Factor
1.6 x 10-19 J/eV
Avogadro Constant
6.023 x 1023 J/eV
Initial Fuel Enrichment (wt% of U-235):
4.0%
Remaining content of U-235 in fuel (wt% of U-235):
1.0%
Amount of uranium that undergo fission in the fuel
4.0%
Explanation / Answer
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.