B. The sub-contractor C. The resident project representative D. The architectien
ID: 1732376 • Letter: B
Question
B. The sub-contractor C. The resident project representative D. The architectiengineer E. The inspector for the timely relocation, facilities on a project site where such utilities are not style Type I/Type II Differing Site Conditions clause, who is responsible removal, relocation, or protection of any existing main or trunkline utility shown accurately on the tion Drawings and could not be observed during a site visit? A. B. C. D. E. engineer/architect of design general contractor construction manager Public Agency/owner of the project Utility company who owns the utility line 22. Unless otherwise specified, the specifications nomally take precedence over A. codes. B. drawings. C. change orders. D. agreement E. none of the above. 23. Which of the following records should not be in loose leaf form? A. Daily reports. B. Inspector's diary C. Accident reports. D. Superintendent memos. E. Telephone messages A resident project representative may direct a change in the Work when such change is authorized in writing by 24. A. the owner B. a code requirement. C. a subcontractor. D. the Builder E. a Supplier 38Explanation / Answer
Answers:
Question:21: Option E.
For differing site conditions, the utility company is responsible for timely removal, relocation or protection of any main or trunkline utility facility. Since in Federal style Type I/Type II differing site conditions, the risk of latent site condition is transferred to the owner. The owner then passes the information to the utility company.
Question 22. Option A: Codes.
The hierarchy of precedence is as follows:
Agreement
Change Order
Drawings
Specifications
Codes.
Question 23. Option: C
Accident reports must be reported in the format and recorded digitally to pass on the information to all necessary stakeholders.
Question 24.A
The owner has the legal right to ask for changes during the course of the project, provided necessary compensation is paid to the contractor.