a True b. False 36. On private commercial, individual and multifamily residential sites, as well as public streets in some jurisdictions, SWI rather than manholes are used as junction boxes. SWI stands for a. Storm Waste Inlet b. Stream Water Inlet c. Standard Water Inlet d. Storm Water Inlet e. None of the above 37. The first step of the preliminary engineering is the- a. Site engineering b. Site development c. Site planning d. Site analysis e. None of the above 38.Street and lot layouts for the subdivision map or building site plans are often prepared by a. Civil engineers b. Architects c. Contractors d. Planners e. All of the above 39. The purpose of preliminary engineering is to get for the project from the appropriate jurisdictions and to evaluate construction. of a. Recognition, details b. Information, estimates c. Approvals, costs d. Costs, details e. Approvals, viability

Explanation / Answer

36) Option D is correct. SWI stands for Storm water inlet. It is used as same as manhole function.

37) Option d is correct. first we need to do site analysis and then planning, engineering and development.

38) Option B is correct. Architects plans the entire area. (example street). Then civil engineer design or develop the area according to the plan.

39)Option B is correct. preliminary studies are done to get hte information of the project and estimation of the project in order to bid on the project.