e. Bureau of Land Management Bethent 12.A land Development Project may include a
ID: 1713780 • Letter: E
Question
e. Bureau of Land Management Bethent 12.A land Development Project may include a. Politicians b. Public Agents c. Entrepreneurs d. All of the above e. None of the above 13.The site engineer for a land developmen t project must be a mechanical engineer a. True b. False 14.American Land Title Association (ALTA) and ASCM establish strict standards for surveying to be used to establish topographic maps. What is ACSM? a. Alliance Congress on Surveying and Mapping b. American Congregation of Surveying and Mapping c. American Congress on Surveying and Mapping d. Alliance Confederation on Surveying and Mapping e. American Confederation on Surveying and Mapping 15.The site analysis of a site must include a. Preliminary Design b. Engineering Feasibility Investigation c. Cost Estimate d. All of the above e. None of the above 16.The Feasibility Report should be prepared by an architect with many years of experience a. True b. False 17.Primary tools for planning a land development project are a. Site Analysis Report b. Feasibility Report c. Soil Report d. Maps and PlansExplanation / Answer
12) Option D is correct. It may involve any of the following.
13) False. He is a civil engineer.
14) Option C is correct. It is American Congress of Surveying and Mapping.
15) Option D is correct. Analysis must include all the process mentioned above.
16) True. It determines all the cost and estimation.
17) Option A is correct. Site analysis report is the primary tool for planning a land development project.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.