1. What types of government approvals and permits will be necessary before const
ID: 1712799 • Letter: 1
Question
1. What types of government approvals and permits will be necessary before construction of the fitness center can begin? What regulatory issues might arise?
2. The contractor and architect finally got together to discuss the conflict over the pool equipment and construction materials. The owner was advised about the conflict, but did not attend the meeting. Instead, the owner sent a written "notice to proceed with construction," without attaching any change orders. He also sent a private email to the architect saying, "You need to work things out with the contractor." However, after much wrangling between the contractor and architect, they could not agree, and neither the drawings nor the specifications were modified to make them consistent.
Pertaining to question #2 - In the construction of a fitness center discussion respond to this - If architect improperly label a drawing, then architect is responsible for the error, which in this case the owner and the architect substituted an inferior quality and not according to the specs, that contractor refuse to installed. The contractor made two mistakes first, he should have written change of order and secondly a written of intent claims that should have been submitted within 10 calendar days.
Explanation / Answer
Before starting the construction of the fitness center a commercial building permit is required. Electrical, mechanical and plumbing work also require permits. A permit may also be required to turn utilities back on after a fire.
Apart from this following permits are also required:
Health/Fitness Facility Standards and Guidelines.
Health Insurance Portability and Accountability Act of 1996 (HIPAA) .
Occupational Safety and Health Standards 29 CFR 1910.1200 Hazard Communication.
Occupational Safety and Health Standards 29 CFR 1910.1030.
21 CFR 801.109 Prescription devices.
ASTM F1749-02 Standard specification for fitness equipment and fitness facility safety signage and labels.
Risk management and emergency policy standards.
Regulatory issue that can be arise for the construction of fitness center is the environmental impact of building as it is the fitness center so it should be a Green or sustainable building and it should help in creating healthier and more resource-efficient methods for construction, renovation, operation, maintenance, and demolition. The elements of the green building program address energy use, water use, construction materials, waste reduction, and the indoor environment.