Mort Allgood, P.E a structural engineering consultant is hired by the town of Ta
ID: 1711224 • Letter: M
Question
Mort Allgood, P.E a structural engineering consultant is hired by the town of Tangelo Florida to update the plans for a pedestrian bridge over Tangelo Creek that was original designed a decade earlier but never built. The engineer who die the original design is now retired and unable to do the work because he has since changed his license to "Reused Status ' What steps must Allgood lake to meet the requirements of Florida rules for the adoption of another's work? [Keyword adoption] a. He would have to redraw the plans and specifications in their entirety. b. He would not be required to redraw the plans and specifications but he would be required to rep ace the title block with his own. c. He would be required to recreate the calculations, site visits, and research. d. He must send a certified letter to the original engineer, successors or assigns of his intention to reuse the documents. c. Answers b, c and d, above.Explanation / Answer
Correct option is e. Answers b,c and d .
The successor will have to perform all the tasks mentioned in options b,c and d .
Refer section 61G15-27.001 of "Rules of the Florida Board of Professional engineers"
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.