Question

construction project managment:

QUESTION 16

The traditional contract project delivery system has three primary contractual parties: the owner, the architect, and the ____.

designer

contractor

consultant

engineer

QUESTION 17

Shop drawings, material data, and samples generally are referred to as ____.

indications

submittals

specifications

schedules

  

QUESTION 18

The ____ is ultimately responsible for the design of the facility to meet occupancy needs and must ensure that the products being installed are suitable to meet these needs.

contractor

architect

designer

fabricator

  

QUESTION 19

At all sites, toilet facilities shall be located within ____ feet, horizontally, of all employees

100

200

300

400

QUESTION 20

____ are held for larger projects to coordinate different areas of work.

Negotiations

Specialized reviews

Partnering meetings

Construction staff meetings

Explanation / Answer

Q16)

The three contractual parties are owner,architect and contractor,

Hence option 2 is correct.

Q17)

Material data, drawings these are all related to specifications of work.

Hence, spections is the correct choice.

Q 18)

The designer is responsible for all the design aspects of the work.

Hence desinger will be the correct answer.

Q19)

200 feet.