Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

In the materials specification of a construction contract, the lighting fixture

ID: 1711006 • Letter: I

Question

In the materials specification of a construction contract, the lighting fixture schedule indicated that 1, 000 total fixtures were required for the project. The ceiling plan drawings showed the 1, 000 fixtures. However, the architectural interior drawings indicate 32 decorative wall lighting fixtures that are not listed on the lighting fixture schedule in the materials specification. The construction contract was awarded as a lump sum contract. What should the Contractor do? Explain. Will the Contractor have to provide the 32 additional wall lighting fixtures without extra compensation? Explain.

Explanation / Answer

Since construction contract was awarded as as a lamp sum contract , contracter have to provide the 32 additional lightning fixture and contracter should show the details of extraa fixture on behalf of lamp sum contract.Due to this contracter would be safe to bear extraa expenses. That's all.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote